Files
Mike Ng efda02e946
Some checks failed
Scorecard supply-chain security / Scorecard analysis (push) Failing after 3m20s
Post / coverage (push) Failing after 26m0s
Post / images (amd64) (push) Failing after 3m12s
Post / images (arm64) (push) Failing after 3m9s
Post / image manifest (push) Has been skipped
Post / trigger clusteradm e2e (push) Has been skipped
Close stale issues and PRs / stale (push) Successful in 54s
docs: update argocd apps pull solution using the clusteradm CLI for easier setup (#982)
Signed-off-by: Mike Ng <ming@redhat.com>
2025-05-06 14:42:34 +00:00

888 B

Troubleshooting

For Argo CD components, check the following containers for logs:

  • argocd-pull-integration-* in the argocd namespace (only on the hub cluster)
  • argocd-applicationset-controller in the argocd namespace
  • argocd-application-controller (only on managed clusters) in the argocd namespace

If the ApplicationSet contains the following status:

status:
    conditions:
    -   lastTransitionTime: "2023-03-21T11:25:06Z"
        message: Successfully generated parameters for all Applications
        reason: ApplicationSetUpToDate
        status: "False"
        type: ErrorOccurred

Despite the type ErrorOccurred, the status is "False", which means the ApplicationSet has been reconciled successfully. If the status is "True", check the error message. If needed, check the argocd-applicationset-controller pod logs in the argocd namespace.